Close Menu
    Facebook X (Twitter) Instagram YouTube LinkedIn
    Festival Insights
    • Home
    • UK News
    • Insights
    • Interviews
    • World News
    • Trends
    • Contact Us
    • UK Festival Awards
    Facebook Instagram LinkedIn
    Festival Insights
    Home » Serious Metal for Download Stages and Structures
    UK News

    Serious Metal for Download Stages and Structures

    By Andy LenthallJune 15, 2023No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Serious Stages’ first major festival of the ’23 summer season began with a sold-out Download Festival at Donington Park Circuit, providing the stages and site structures.

    Accommodating the multi-ton technical production and scenic elements, the main ‘Apex’ stage was a Serious 25m TZ 6-post roof, including a ‘Super Bowstring Arch’ with a 10-tonne capacity. This was linked to goalposts for screens and audio by Download’s iconic Totem décor, creating a spectacular 67.2m wide focal point.

    Metallica brought in five cylindrical video towers, as part of their European festival tour set, which meant Serious switched to two side-by-side front-of-house structures (rather than the festival’s usual four storey FOH with rear video screen).

    A 40% increase in audience size meant that the production team paid particular to the PA design to ensure good sound quality and dispersion for this discerning audience. Serious provided more delay towers, installing six 12m Lunas and three 12m Asteroids in the mainstage arena.

    Serious Stages Operation Manager Abbey Thomas comments:

    “It was great to support (Festival Director) John Probyn and Live Nation’s Download Festival team to deliver this 20th anniversary, biggest ever Download. All of the headliners brought sets that looked stunning on both stages. Sometimes it’s easy to forget they’re performing on 220 tonnes of Serious steel and stage engineering.”

    The Serious crew worked through the weekend, with significant overnight changes to the stage, adding a front-of-stage thrust built overnight for Bring Me The Horizon

    Working through a sun-baked build, crews stayed well hydrated and completed their installation ahead of schedule for the technical teams to bring in PA, lights and screens. Another change to this year’s site saw the 820sqm Assisted Viewing Platform (AVP) relocated to stage right in the sloping main audience arena.

    The second ‘Opus’ stage was a Serious 22m Supernova, 5 bay configuration, with new goalposts creating a 42m wide frontage. Featuring bands including Ghost, Placebo and Evanescence, Serious also supplied the front-of house- tower and AVP, as well as over 800 sqm of stage decking, with ramps and steps, FOH towers and AVP platforms in three tented stages.

    All of stages and site structures were designed and manufactured at Serious’ Wells headquarters, and with their long lifespan, the company is committed to minimising its carbon impact through re-usable components and logistical efficiency to minimise transport.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Andy Lenthall

    Related Posts

    Independent report finds JBM Music’s National Bowl events generated £21.2m in additional spend for Milton Keynes

    November 24, 2026

    The UK Festival Awards return to Manchester this December

    November 24, 2026

    UK Festival Awards partners with Balance

    November 20, 2026

    Comments are closed.







    Facebook X (Twitter) Instagram YouTube LinkedIn
    © 2026 Festival Insights

    Type above and press Enter to search. Press Esc to cancel.

    GDPR Cookie Banner

    We are using cookies to give you the best experience on our website.

    You can find out more about which cookies we are using or switch them off in .